TokayOps
How it works
Run it
Install
Releases
Blog
Source
Blog
Engineering
How the hard parts are actually built: schedule state, time zones, delivery, storage.
all
engineering
rss
Engineering
August 16, 2026
On-call scheduling from scratch: what to decide before the first line of code
An on-call schedule looks like a function of the current moment and behaves like a function of its own history. The design decisions that follow from that: revisions, phase anchors, calendar arithmetic, and overrides.